Remodeling
Bathroom Remodel Checklist for San Antonio Homes: A Planning Guide
Use this bathroom remodel checklist for your San Antonio home: goals, layout, selections, permits and walkthrough. Plan it right, call (210) 796-3695.
Quick answer
Work a bathroom remodel checklist in this order: decide what the room needs to fix, pick the scope level, set the layout, choose every selection before demolition, confirm which permits apply, sign an itemized scope with allowances, then follow the build through rough-in inspections, waterproofing, tile and fixtures to a final walkthrough. In San Antonio, plumbing and electrical work is done by licensed trade contractors.
Topics
- Your bathroom remodel checklist at a glance
- Decide what the remodel needs to fix
- Cosmetic refresh or full gut?
- Plan the layout and clearances
- Ventilation, lighting and moisture control
- Choose selections before construction starts
- Licensed plumbing and electrical work
- Permits and inspections
- Check for hidden problems before you lock the budget
- Questions to ask before you sign
- The typical sequence
- Final walkthrough checklist
- Working with 214 Veteran Solutions
- Frequently asked questions
A bathroom remodel checklist keeps every decision for your San Antonio bathroom in the right order, from the first walk-through to the final punch list. A bathroom is a small room with a lot of trades in it: demolition, plumbing, electrical, waterproofing, tile, glass, cabinetry and paint. Work through each phase in order and those pieces come together when they're needed.
Your bathroom remodel checklist at a glance
| Phase | What to settle | Finish it before |
|---|---|---|
| 1. Goals | What isn't working, who uses the room, must-haves | Calling contractors |
| 2. Scope level | Refresh, layout change or full gut | Requesting estimates |
| 3. Layout | Fixture locations, storage, grab bar blocking | Final pricing |
| 4. Selections | Tile, vanity, top, fixtures, glass, lighting, fan | Demolition |
| 5. Permits | Which trade permits apply, any historic or flood review | Rough-in |
| 6. Contract | Itemized scope, allowances, change process, sequence | Work starts |
| 7. Construction | Demo, rough-in, inspections, waterproofing, tile, finish | Final walkthrough |
| 8. Closeout | Punch list, final inspections, care information | Final payment |
Decide what the remodel needs to fix
Start with what doesn't work today: a cramped shower, too little storage, poor lighting, or a tub nobody uses. Common San Antonio scopes include converting a tub/shower combo to a walk-in shower, upgrading the vanity and countertop, new tile and flooring, and aging-in-place features such as grab bars, curbless showers and comfort-height toilets.
Before anyone visits, check off these basics:
- List the three things that bother you most about the room.
- Note who uses it: kids, guests, an older parent, or someone with limited mobility.
- Measure the room and photograph every wall, the ceiling and the floor.
- Look for warning signs such as a soft floor near the toilet, loose or cracked tile, stains on the ceiling below, or a musty smell.
- Decide where your household will shower while this bathroom is out of service.
Cosmetic refresh or full gut?
- Refresh: new vanity, fixtures, paint, lighting and possibly flooring, keeping the layout.
- Layout change: moving the shower, toilet or vanity, which means new plumbing rough-in.
- Full gut and rebuild: demolition down to the studs, new plumbing rough-in, waterproofing and full tile installation.
The further you go, the more trades and inspections are involved. The scope level you pick is also the biggest lever on what a San Antonio bathroom remodel costs.
Plan the layout and clearances
Keeping the toilet, shower and vanity where they are is the simplest path. If your house sits on a concrete slab, moving a drain means cutting and patching the slab. If the new layout adds or removes a structural wall, the City of San Antonio Development Services Department (DSD) Home Remodeling FAQ (a 2019 document, so confirm current rules with DSD) says you'll need a third-party engineering report and an inspection.
As you sketch the layout, check:
- Door swing, and room to open vanity doors and drawers fully.
- Space to stand comfortably in front of the toilet and to step out of the shower.
- Where towels, toiletries and cleaning supplies will live: niches, drawers, a medicine cabinet or a linen cabinet.
- Solid blocking in the walls for grab bars, even if you don't install bars yet.
Building codes set minimum clearances around fixtures and minimum shower sizes, so confirm the plan meets them before anything is ordered. If anyone in your home uses a walker or wheelchair, the U.S. Access Board's ADA guide to toilet rooms is a useful reference: it places grab bars 33 to 36 inches high, measured to the top of the gripping surface, and calls for turning space such as a 60-inch circle. Our accessible bathroom layouts guide covers those choices for San Antonio homes.
If the plan includes swapping a tub for a shower, the tub to shower conversion planning guide lists the drain, entry and glass choices to settle first.
Ventilation, lighting and moisture control
A bathroom fan that actually removes moisture protects the tile, paint and framing you're paying for. The EPA's guide to mold and moisture recommends running the bathroom fan or opening a window when you shower, and keeping indoor humidity below 60 percent, ideally between 30 and 50 percent. Ask where the fan duct will end; you want the moisture leaving the house, not collecting in the attic.
Plan lighting in layers: even light at the mirror for grooming, a light rated for the shower area, general ceiling light, and a low night light if anyone gets up at night. DSD's FAQ says installing exhaust fans needs a mechanical permit, and adding receptacles or light fixtures needs an electrical permit, so settle the fan and lighting plan before rough-in. Our electrical remodel coordination page explains how that work is scheduled.
Choose selections before construction starts
Pick tile, vanity, countertop, fixtures, glass and lighting before demolition, so materials are on hand when each trade arrives. Porcelain, ceramic, natural stone and luxury vinyl plank each have tradeoffs. Our guide to quartz vs. granite countertops covers one of the most common decisions.
Your selections checklist:
- Floor tile, wall and shower tile, and grout color
- Tub or shower pan, shower valve and trim, showerhead and drain style
- Vanity, countertop, sink and faucet
- Toilet
- Shower door or glass panel
- Exhaust fan, light fixtures, mirror or medicine cabinet
- Towel bars, hooks, paper holder and grab bars
- Paint color and sheen
When you shop fixtures, look for the EPA WaterSense label. WaterSense toilets use 1.28 gallons per flush or less, 20 percent less than the 1.6-gallon federal standard. Labeled showerheads use no more than 2.0 gallons per minute, and labeled bathroom faucets no more than 1.5.
San Antonio water is hard. SAWS lists typical hardness of 15 to 20 grains per gallon, and the USGS notes that hard water can cause mineral buildup in plumbing and fixtures. Favor finishes and shower glass you can wipe down easily. If you want a water softener added, DSD's FAQ lists softeners among the work that needs a plumbing permit.
Licensed plumbing and electrical work
Moving or replacing fixtures usually involves plumbing, and new lighting, fans or heated floors involve electrical. In Texas, plumbers are licensed by the Texas State Board of Plumbing Examiners and electrical contractors by TDLR. At 214 Veteran Solutions, that work is done by licensed trade contractors we coordinate with your scope through our plumbing remodel coordination.
Permits and inspections
Whether your bathroom remodel needs a permit depends on the scope and the jurisdiction. The City of San Antonio Development Services Department lists which work requires a permit. Its No Permit Required list includes cabinets and countertops, painting, repairing sheet rock and tiling. Its Home Remodeling FAQ says installing faucets, sinks and toilets needs a plumbing permit. For a hired-contractor remodel, licensed trades obtain the plumbing, electrical and mechanical permits. DSD also allows a homeowner plumbing permit for an existing homestead when the resident owner personally performs the work. The homeowner affidavit requires doing that plumbing work without assistance, excludes business or rental property and requires City inspection.
When a permit applies, licensed trades carry their trade permits, and inspections are scheduled before walls and floors are closed up. If your home is in a historic district, a neighborhood conservation district or a flood zone, DSD's FAQ says the application is also reviewed by the Office of Historic Preservation, flood zone staff or conservation district staff; historic home renovation planning covers that process. San Antonio adopted the 2024 International Code Council codes on January 30, 2025, with the energy code still on the 2021 edition. See the San Antonio building permit guide.
Check for hidden problems before you lock the budget
Water has often been working behind bathroom tile for years. Soft subfloor around the toilet, rot behind a tub surround and mold on the back of drywall are common finds. The EPA's mold cleanup page says mold in porous materials may be difficult or impossible to remove completely, which is why damaged drywall or subfloor is usually replaced. Hold a contingency and get in writing how hidden-condition work is priced and approved.
If your home was built before 1978, the EPA's Renovation, Repair and Painting Program applies to paid work that disturbs painted surfaces. Ask how the crew will follow lead-safe work practices.
Questions to ask before you sign
- Is the estimate itemized by demolition, plumbing, electrical, ventilation, waterproofing, tile, fixtures, glass and paint?
- What does each allowance cover?
- Which waterproofing method goes behind the shower tile?
- Which permits does the job need, and who pulls each one?
- In what order will the trades work, and where do inspections fall?
- How are changes and hidden damage approved before work continues?
- How will the rest of the house be protected from dust, and how is cleanup handled?
Fill out our site-visit scope worksheet before contractors visit so every bidder prices the same job, and use how to compare remodeling companies in San Antonio to weigh the bids.
The typical sequence
- Site visit and written scope
- Selections and ordering
- Demolition
- Plumbing and electrical rough-in, then inspections where required
- Waterproofing, backer board and drywall
- Tile and flooring
- Vanity, countertop, fixtures, glass and paint
- Final walkthrough
Ask for this order in writing with the inspection points marked, and confirm long-lead items such as custom vanities, stone tops and glass are ordered early enough to keep the trades moving.
Final walkthrough checklist
- Run every faucet, the shower and the toilet, and watch for drips and slow drains.
- Turn on the fan and every light, and test each receptacle.
- Look over tile, grout and caulk lines with a flashlight held low against the surface.
- Open and close the shower door, vanity doors and drawers.
- Confirm required inspections passed and the permit is closed out.
- Keep product manuals, finish names and a few spare tiles for future repairs.
- Write down any punch-list items and agree on dates to finish them.
Working with 214 Veteran Solutions
214 Veteran Solutions is a veteran-owned contractor in San Antonio. We define the layout, tile, vanity and fixture scope before construction begins, and we coordinate every trade as your single point of contact for a bathroom remodel in San Antonio and nearby cities such as Alamo Heights. Call (210) 796-3695 or request an estimate to book an estimate consultation.
Sources
- City of San Antonio Development Services, Residential Permits.
- Texas State Board of Plumbing Examiners, tsbpe.texas.gov.
- Texas Department of Licensing and Regulation, tdlr.texas.gov.
- City of San Antonio Development Services Department, Home Remodeling FAQ.
- City of San Antonio Development Services Department, No Permit Required List.
- City of San Antonio Development Services Department, Codes & Ordinances.
- U.S. Access Board, Guide to the ADA Standards, Chapter 6: Toilet Rooms.
- U.S. Environmental Protection Agency, A Brief Guide to Mold, Moisture and Your Home.
- U.S. Environmental Protection Agency, Mold Cleanup in Your Home.
- U.S. Environmental Protection Agency, Lead Renovation, Repair and Painting Program.
- U.S. Environmental Protection Agency, WaterSense Labeled Toilets.
- U.S. Environmental Protection Agency, WaterSense Labeled Showerheads.
- U.S. Environmental Protection Agency, WaterSense Labeled Bathroom Faucets.
- San Antonio Water System (SAWS), Water Quality FAQs.
- U.S. Geological Survey, Hardness of Water.
- Texas Department of Licensing and Regulation, Electricians.
Ready to Get Started?
Contact 214 Veteran Solutions today for a free consultation and estimate on your San Antonio project.
Related services: Bathroom Remodel, Residential Remodeling